FREE SHIPPING on orders over €20 in Ire/NI (over £30 in UK). Reduced-rate shipping WORLDWIDE...

Long Leads for Training
Long Leads for Training
Long Leads for Training
Long Leads for Training
Long Leads for Training
Long Leads for Training

Long Leads for Training

Regular price €7,64 €5,94 Sale

Find on Amazon

Brand: Hi Kiss

Colour: Black

Great for training, hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!

Features:

  • NYLON TRAINING LEAD - This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for small and medium and large dogs. You'll love using it as a backyard dog leash, for off leash dog training, and more.
  • DIMENSIONS: This dog leash comes in a variety of lengths (6 Feet 10 Feet 30 Feet 50 Feet 100 Feet 200 Feet.)
  • THICKENED HANDLE: Handle is made from advanced diving material, more comfortable and wearable
 Nylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range is built with heavy duty materials that can withstand daily use over an extended period of time. It can be used with small and medium and large size dogs

Package Dimensions: 4.0 x 4.0 x 1.5 inches